It is highly recommended to use current templates (based on SP 48.13330 or similar standards) from trusted professional resources.
When searching for "skachat akty skrytykh rabot," ensure the downloaded template includes the latest requirements from the and that it complies with the specific requirements of the construction project's design documentation. skachat akty skrytykh rabot
Keep this in the executive documentation file for at least 5 years (usually for the building's lifespan). 7. Recommendation It is highly recommended to use current templates
Notify the Technical Supervision inspector for sign-off. Sign and Seal: Ensure all parties sign the document. Confirms materials and techniques matched specifications
Confirms materials and techniques matched specifications.
Required for signing Acts of Completed Works (KS-2, KS-3). 4. Key Components of the Certificate A valid ASR template must contain the following fields: Project Name and Address. Contractor Information. Name of Hidden Work (e.g., "Waterproofing of foundation"). Reference to Design Documentation (drawings, SNiP, GOST). Materials Used (with quality certificates). Dates of Execution and Inspection.